Home / Series / This Old House / Aired Order / Season 45 / Episode 20

Glen Ridge: QR Construction

The new two-story addition is framed, and the front porch is being rebuilt. Painting starts on the new wood windows. An interior wall is framed to straighten out a sag in the upper floor. Exterior colors are chosen, plumbing pipes are isolated from cold weather, and header-less window opening is framed. A foolproof method of laying out plumbing and electrical fixtures is shared.

English
  • Originally Aired April 18, 2024
  • Runtime 25 minutes
  • Network PBS
  • Created March 29, 2024 by
    aaronk
  • Modified April 20, 2024 by
    aaronk