Home / Series / Train Rescue Down Under / Aired Order / Season 1 / Episode 5

One Day Mission to Replace Freight Engine

A freight train needs an urgent engine replacement after a critical failure, a 132 T loco requires a complex bogie change, plus catch the special forces of rail, the RORU team, in action.

English
  • Originally Aired June 17, 2025
  • Runtime 45 minutes
  • Content Rating Australia PG
  • Network Seven
  • Created June 3, 2025 by
    Watchmanz
  • Modified June 24, 2025 by
    Watchmanz